Scope
Includes developing the master plan for the construction of a new 6 Phase development which includes residential, commercial, a stormwater pond, and required roadways. THL was contacted by the Owner to oversee the master planning and develop a cost effective program for the construction of all phases.
Solution
THL retained the consultants and provided significant input into the design concepts. As well an overall project cost analysis and scheduling plan was developed. Meetings were held with the City to obtain approval on the Master Plan so work can proceed.