Scope
Includes the construction of a new building including positioning it on the site. THL was contacted by the Owner to assist in resolving the final complex design issues so that the permit drawings can proceed and condo sales can commence. Plus provide an overall project cost analysis and scheduling plan.
Solution
THL immediately completed a Value Engineering exercise which substantially reduced the project cost while improving the solution. Meetings were held with the City to confirm their acceptance of the changes, then condo sales began 4 months after THL commenced. THL was heavily involved in the design improvements, condo sales materials, funding, and all other aspects of the project. We also retained the remaining consultants to finalize the design.
Type
Residential